Wimmera Mallee Pipeline Project: An Engineering Success
On the $500M Wimmera Mallee Pipeline Project, in which Mitchell designed and built over 8,000km of pipelines, pump stations and water storages in four years, one of the engineering challenges was to keep Survey and Design ahead of the speed of construction. Dedicated teams of engineer’s and CAD draftspeople...
Read more