Santos GLNG – Fairview

PIPELINES

Completion of 440km DN63 to DN800 Gathering Pipelines

    • Major Tie ins
    • Live Digs & connections
    • Pneumatic strength and leak testing
    • Completion of PE pipelines
    • Replacement of GRE pipeline with SDR7.4 PE
    • Completion of Steel pipeline reinstatement
    • CP commissioning
    • Low Point Drains
    • High Point Vents
    • Golden Welds
    • Reinstatement
    • Test Packs
    • Material Data Register
    • Reinstatement
    • Quality documents turnover

 

CIVIL WORKS

Completion of HCS04 and HSC05 Civil Works

    • Major Tie ins
    • Road pavements
    • Drainage
    • Bituminous Sealing
    • Concrete works
    • Steel works
    • Material procurement

The completion of the Civil works at Hub HSC 05 was carried out after the plant was live. Mitchell's carried out the works under strict permit systems without breach.