Project

Bingegang Pipeline Realignment

A new 14km pipeline to replace the existing pipeline. Includes a Break Tank, 66KV OHL, Pump Station, salvage and reuse of existing infrastructure as nominated, outlets, crossings, associated local drainage provisions, fencing and maintenance access infrastructure.

Project Details

LOCATION

Bingegang, QLD

PROJECT VALUE

7m

YEAR

2015

CLIENT

BMD Constructions

Related Projects

NSW Department of Industry

Nimmie-Caira Wetlands

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.