Project

Chiltern Valley to Koonoomoo Gas Transmission Pipeline

113 km of 150mm and 200mm dia steel gas pipe

Project Details

LOCATION

Cobram, VIC

PROJECT VALUE

1.5m

YEAR

1998

CLIENT

Minson Construction

Related Projects

Westside Corporation

Meridian Seamgas Trunklines

Mitchell was engaged on a Lump Sum EPC basis:

Engineer: including detail design of the pipeline alignments, profiles, road, waterway & service crossings, vents & drains, taking into account landholder constraints, endangered habitat and access issues, and SMS all to APGA CSG Gathering code.

Procure: including the purchase, transport, storage and correct dispatch of all materials and external services providers.

Construct: Install, test and commission the pipelines, and handover As Built GIS and complete MDR.

Evolution Resources PTY LTD

Cowal Gold Water Pipeline

Evolution’s Cowal Operation is located approximately 40km north-east of West Wyalong in New South Wales, Australia. This high-quality Australian gold asset with a long history of stable, large scale, low cost production. The mine pit encroaches the Lake Cowal ephemeral lake system. The lake is approximately 9.5km wide when full.