Wimmera Mallee Pipeline Project _ Supply Systems 2D Distribution

Design and construction of 1,640 km of pipelines ranging from 250mm to 50mm

Project Details

LOCATION

Wimmera Mallee, VIC

PROJECT VALUE

41m

YEAR

2007

CLIENT

Grampians Wimmera Mallee Water

Related Projects

Carmichael Rail Network

Carmichael Rail Pipeline

The Carmichael coal mine is located in the north Galilee Basin, Queensland, approximately 280km south of Townsville and 300km west of Mackay. The work scope included the construction of a water pipeline and procurement of associated pumping equipment & water storages.

Santos Limited

Roma West 2B Gathering Project

This particular section included gas and water gathering pipelines, along with the added complexity of installation of HV & FOC reticulation, often commingled within the trenches with the PE Gas & Water pipelines.

Pneumatic testing was progressively completed in five defined sections, allowing a sequenced handover of the asset to commence early gas extraction.

Completed on time and on budget, with zero defects, despite significant challenges of slow rock excavation and inclement weather.