Project

Darling Anabranch Pipeline Project

320km

Pipelines

8

Months to Build

Zero

LTI’s

2

Pump Stations

The DAPP comprised of full design, supply, construction, commissioning, provision of operations manuals and training of the 320km stock and domestic system in remote rural farming area of western NSW, including 2 pump stations, river intakes and lagoons. Mitchell employed a large number of Indigenous personnel on the project and the Aboriginal Participation in Construction Guidelines (NSW) were written on the basis of this project. Mitchell delivered the project in 8 months, some 4 months ahead of schedule with zero LTI’s.

Project Details

  • 320km of pipelines 375-50mm in diameter
  • 2 Pumping stations, including buildings, mechanical, electrical and software
  • River intakes
  • Lagoons
  • Hydraulic System Analysis
  • Survey, design and As-Constructed plans
  • Commissioning, provision of Operating Manuals and Training

LOCATION

Menindee, NSW

PROJECT VALUE

54m

YEAR

2006

CLIENT

NSW Department of Commerce

Related Projects

Evolution Resources PTY LTD

Cowal Gold Water Pipeline

Evolution’s Cowal Operation is located approximately 40km north-east of West Wyalong in New South Wales, Australia. This high-quality Australian gold asset with a long history of stable, large scale, low cost production. The mine pit encroaches the Lake Cowal ephemeral lake system. The lake is approximately 9.5km wide when full.

BMD Construction

Middlemount Coal Pipeline

The Middlemount Coal Mine (Mine) is an open cut coal mine located approximately 270 km west-northwest of Rockhampton and approximately 10 km south west of the township of Middlemount. The work was required to be performed both ON & OFF mine lease for Peabody Energy and Yancoal Australia.