Project

Century Zinc

300km 300mm Gas pipeline

Project Details

LOCATION

Queensland, QLD

PROJECT VALUE

1.5m

YEAR

1998

CLIENT

Transfield Construction

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.

Evolution Resources PTY LTD

Cowal Gold Water Pipeline

Evolution’s Cowal Operation is located approximately 40km north-east of West Wyalong in New South Wales, Australia. This high-quality Australian gold asset with a long history of stable, large scale, low cost production. The mine pit encroaches the Lake Cowal ephemeral lake system. The lake is approximately 9.5km wide when full.