Project

Dewhurst South Gas Flowline

The final works package from the below Pre-field Development for Santos. A 4.6km of DN315 HDPE Gas Flowline through the Pilliga State Forest, with a narrow ROW alongside a track.

Project Details

LOCATION

Narrabri, NSW

PROJECT VALUE

340k

YEAR

2018

CLIENT

Santos

Related Projects

BMD Construction

Middlemount Coal Pipeline

The Middlemount Coal Mine (Mine) is an open cut coal mine located approximately 270 km west-northwest of Rockhampton and approximately 10 km south west of the township of Middlemount. The work was required to be performed both ON & OFF mine lease for Peabody Energy and Yancoal Australia.

Santos Limited

Roma West 2B Gathering Project

This particular section included gas and water gathering pipelines, along with the added complexity of installation of HV & FOC reticulation, often commingled within the trenches with the PE Gas & Water pipelines.

Pneumatic testing was progressively completed in five defined sections, allowing a sequenced handover of the asset to commence early gas extraction.

Completed on time and on budget, with zero defects, despite significant challenges of slow rock excavation and inclement weather.