Project

Mt Hope Stock & Domestic Scheme

40km of HDPE pipelines ranging from 63mm to 110mm, and 1 pump station.

Project Details

LOCATION

Mount Hope, VIC

PROJECT VALUE

1m

YEAR

2011

CLIENT

RPS Aquaterra

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.

Santos Ltd

K129 Gathering Pipelines