Project

Poochera to Streaky Bay Pipeline

Design & Construct 55km of water line from 150 to 200 diam

Project Details

LOCATION

Streaky Bay, SA

PROJECT VALUE

6.4m

YEAR

2002

CLIENT

South Australian Water

Related Projects

Santos Limited

Roma West 2B Gathering Project

This particular section included gas and water gathering pipelines, along with the added complexity of installation of HV & FOC reticulation, often commingled within the trenches with the PE Gas & Water pipelines.

Pneumatic testing was progressively completed in five defined sections, allowing a sequenced handover of the asset to commence early gas extraction.

Completed on time and on budget, with zero defects, despite significant challenges of slow rock excavation and inclement weather.

Santos Limited

GLNG – Fairview CSG Gathering Lines