Project

Welsford St Water Treatment Plant Pipeline

Approx 10km Alum sludge outfall pipeline

Project Details

LOCATION

Shepparton, VIC

PROJECT VALUE

3m

YEAR

2003

CLIENT

Goulburn Valley Water

Related Projects

Grampians Wimmera Mallee Water

South West Loddon Pipeline

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.