Project

Bega to Yellow Pinch Dam

20km

Pipelines

DN450

DICL

20ml

Per day Capacity

$24m

Project Value

Mitchell designed and constructed the project which included 20km’s of DICL DN450 pipelines with a 0.5ML balance tank. Works also included the conversion of an existing Wolumla Village reservoir to a balance tank for an ultimate transfer of 20ML/day of raw water from South Bega reservoir site to the inlet pipe-work into Yellow Pinch Dam. Flouride and Chlorine Dosing Equipment was also costructed at the Sough Bega Reservoir along with a 1ML reservoir at Wolumla.

The project was designed to improve the water supply security of the existing Tantawangalo-Kiah water supply system. It will also lessen extraction of water from Tantawangalo Creek and the Kiah Borefield during low stream flows by connecting a new source of water to the system and enhance operational flexibility in the supply of water from the sources and dams to customers.

Project Details

  • 20km of DICL pipelines 450mm in diameter
  • 132Kw Pump Station at Bega
  • Flouride and Chlorine Dosing equipment
  • New 1.0ML concrete reservoir
  • Upgrade Wolumla Pump Station
  • Upgraded existing 0.5ML Balance Tank at South Bega
  • Above ground creek crossing attached underneath Frogs Hollow Bridge
  • Survey, design and As-Constructed plans
  • Traffic Management along Pacific Hwy

LOCATION

Bega, NSW

PROJECT VALUE

24m

YEAR

2012-13

CLIENT

NSW Department of Commerce

Related Projects

Grampians Wimmera Mallee Water

Wimmera Mallee Pipeline Project

Major construction challenges included major river crossings, a variety of cultural heritage sites and liaising with some 4,000 property owners.

Mitchell designed and constructed six of the seven supply systems in just over 3 years, delivering the project 6 years ahead of the original 10 year time frame.

Mitchell’s safety performance on the project was outstanding, completing 900,000 manhours without a single LTI.

Westside Corporation

Meridian Seamgas Trunklines

Mitchell was engaged on a Lump Sum EPC basis:

Engineer: including detail design of the pipeline alignments, profiles, road, waterway & service crossings, vents & drains, taking into account landholder constraints, endangered habitat and access issues, and SMS all to APGA CSG Gathering code.

Procure: including the purchase, transport, storage and correct dispatch of all materials and external services providers.

Construct: Install, test and commission the pipelines, and handover As Built GIS and complete MDR.