Project

Clare Valley Stage 3 _ Reticulation

Approx 8km township reticulation

Project Details

LOCATION

Clare Valley, SA

PROJECT VALUE

2.05m

YEAR

2004

CLIENT

SA Water

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.

NSW Department of Commerce

Darling Anabranch Pipeline Project