Dewhurst South Gas Flowline

The final works package from the below Pre-field Development for Santos. A 4.6km of DN315 HDPE Gas Flowline through the Pilliga State Forest, with a narrow ROW alongside a track.

Project Details

LOCATION

Narrabri, NSW

PROJECT VALUE

340k

YEAR

2018

CLIENT

Santos

Related Projects

Carmichael Rail Network

Carmichael Rail Pipeline

The Carmichael coal mine is located in the north Galilee Basin, Queensland, approximately 280km south of Townsville and 300km west of Mackay. The work scope included the construction of a water pipeline and procurement of associated pumping equipment & water storages.

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.