Project

GLNG _ CSG _ Roma Hub 02

2000 joints of HDPE piping ranging in size from 20mm to 400mm OD. 14km of HDPE piping ranging in size from 50mm to 400mm OD.

Project Details

LOCATION

Roma, QLD

PROJECT VALUE

8.5m

YEAR

2014

CLIENT

Santos/Fluor/Macdow

Related Projects

Grampians Wimmera Mallee Water

South West Loddon Pipeline

Grampians Wimmera Mallee Water

Wimmera Mallee Pipeline Project

Major construction challenges included major river crossings, a variety of cultural heritage sites and liaising with some 4,000 property owners.

Mitchell designed and constructed six of the seven supply systems in just over 3 years, delivering the project 6 years ahead of the original 10 year time frame.

Mitchell’s safety performance on the project was outstanding, completing 900,000 manhours without a single LTI.