2000 joints of HDPE piping ranging in size from 20mm to 400mm OD. 14km of HDPE piping ranging in size from 50mm to 400mm OD.

Project Details

LOCATION

Roma, QLD

PROJECT VALUE

8.5m

YEAR

2014

CLIENT

Santos/Fluor/Macdow

Related Projects

Santos Ltd

K129 Gathering Pipelines

Goulburn Murray Water

Tungamah Pipeline Project

A major challenge on the project from the outset was the resistance of several key Landowners to joining the scheme threatening to derail the project. Face to face meetings between the Landowners and Managing Director Wayne Mitchell established Landowner consent for the 40km of pipelines to be constructed through their properties, with access points omitted pending resolution of Water Authority issues.