2000 joints of HDPE piping ranging in size from 20mm to 400mm OD. 14km of HDPE piping ranging in size from 50mm to 400mm OD.

Project Details

LOCATION

Roma, QLD

PROJECT VALUE

8.5m

YEAR

2014

CLIENT

Santos/Fluor/Macdow

Related Projects

Santos Ltd

K129 Gathering Pipelines

Santos Limited

Roma West 2B Gathering Project

This particular section included gas and water gathering pipelines, along with the added complexity of installation of HV & FOC reticulation, often commingled within the trenches with the PE Gas & Water pipelines.

Pneumatic testing was progressively completed in five defined sections, allowing a sequenced handover of the asset to commence early gas extraction.

Completed on time and on budget, with zero defects, despite significant challenges of slow rock excavation and inclement weather.