Project

Meridian Seamgas Trunklines

36km

Pipelines

DN630

Gas Pipeline

DN110

Water Pipeline

$8.5m

Value

WCL’s Meridian field development program highlighted a requirement for an expansion of their HDPE gathering network to realise additional production by lowering wellhead pressure and having the ability to re-route gas flow between the Moura Compression Station, the Moura Central Compression Station and the Nipan Compressor Station.

Mitchell was engaged on a Lump Sum EPC basis:

Engineer: including detail design of the pipeline alignments, profiles, road, waterway & service crossings, vents & drains, taking into account landholder constraints, endangered habitat and access issues, and SMS all to APGA CSG Gathering code.

Procure: including the purchase, transport, storage and correct dispatch of all materials and external services providers.

Construct: Install, test and commission the pipelines, and handover As Built GIS and complete MDR.

Project Details

  • 36km’s DN630 gas & DN110 water PE pipelines
  • LDP’s
  • HPV’S
  • Valves
  • Pits
  • Future offtakes
  • Multiple foreign services crossings
  • Major creek crossings
  • Thrust Bored road / rail crossings
  • MDR documentation
  • Hydrotesting & Commissioning

LOCATION

Gladstone, QLD

PROJECT VALUE

8.5m

YEAR

2019-20

CLIENT

Westside Corporation

Related Projects

BMD Construction

Middlemount Coal Pipeline

The Middlemount Coal Mine (Mine) is an open cut coal mine located approximately 270 km west-northwest of Rockhampton and approximately 10 km south west of the township of Middlemount. The work was required to be performed both ON & OFF mine lease for Peabody Energy and Yancoal Australia.

Grampians Wimmera Mallee Water

Wimmera Mallee Pipeline Project

Major construction challenges included major river crossings, a variety of cultural heritage sites and liaising with some 4,000 property owners.

Mitchell designed and constructed six of the seven supply systems in just over 3 years, delivering the project 6 years ahead of the original 10 year time frame.

Mitchell’s safety performance on the project was outstanding, completing 900,000 manhours without a single LTI.