Project

Middlemount Coal Pipeline

The construction of a 14km pipeline was to replace the existing pipeline for the Middlemount Coal Mine. The works included a break tank, 66KV OHL, pump station, salvage and will reuse the existing infrastructure including, outlets, crossings, associated local drainage provisions, fencing and maintenance access infrastructure.

The Middlemount Coal Mine (Mine) is an open cut coal mine located approximately 270 km west-northwest of Rockhampton and approximately 10 km south west of the township of Middlemount. The work was required to be performed both ON & OFF mine lease for Peabody Energy and Yancoal Australia.

Project Details

  • Construct 14km’s DN450mm DICL pipe
  • Air, isolation, scouroutlets and stockofftakes
  • Pumping Station pipework and pump manifolds
  • Fabrication and install air valves
  • Fabrication and install scour outlets
  • Installation of pipe work for swab control and non-return structure, balance tank inlet and outlet pipework

LOCATION

Middlemount, QLD

PROJECT VALUE

12m

YEAR

2015

CLIENT

BMD Construction

Related Projects

Santos Limited

Roma West 2B Gathering Project

This particular section included gas and water gathering pipelines, along with the added complexity of installation of HV & FOC reticulation, often commingled within the trenches with the PE Gas & Water pipelines.

Pneumatic testing was progressively completed in five defined sections, allowing a sequenced handover of the asset to commence early gas extraction.

Completed on time and on budget, with zero defects, despite significant challenges of slow rock excavation and inclement weather.

Grampians Wimmera Mallee Water

South West Loddon Pipeline