Project

Narromine Irrigation Stock & Domestic Water Supply

187km of HDPE & PVC pipelines ranging in size from 63mm to 280mm OD and 1 pump station

Project Details

LOCATION

Dubbo, NSW

PROJECT VALUE

8.5m

YEAR

2014

CLIENT

Narromine Irrigation Board

Related Projects

Grampians Wimmera Mallee Water

South West Loddon Pipeline

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.