Project

Nimmie-Caira Wetlands

377km

Pipelines

4

Months to Build

2

Pumping Stations

14 tonne

Recyclables

The Nimmie Caira Stock and Domestic Water Supply Scheme supplies stock and non-potable domestic water to the entire Nimmie Caira property. The property is 84,417 ha situated in the lower reaches of the Murrumbidgee River floodplain (the Lowbidgee) between Maude and Balranald, South Western NSW. It is a vital component the Lowbidgee being the largest remaining area of wetlands in the Murrumbidgee Valley. The project balances environmental and Aboriginal cultural heritage protection with commercial use, and by doing so creates an asset for the local community and the Murray Darling Basin.

Project Details

  • 377 km distribution pipelines ranging from DN50-DN200 HDPE
  • 1 automated remote controllable river pumpstation including building, instream structure, mechanical, electrical and software
  • 1 automated remote controlled booster pumpstation including building, mechanical, electrical and software
  • Construction of two 0.2mL balancing tanks
  • 232 fabricated scour, air, stop valve assemblies with concrete surrounds
  • 113 concrete troughs sitting on concrete slabs
  • 140 poly tanks installed
  • Survey, design and As-Constructed plans
  • Commissioning, provision of Operating Manuals and Training

LOCATION

Balranald, NSW

PROJECT VALUE

180m

YEAR

2019

CLIENT

NSW Department of Industry

Related Projects

Goulburn Murray Water

Tungamah Pipeline Project

A major challenge on the project from the outset was the resistance of several key Landowners to joining the scheme threatening to derail the project. Face to face meetings between the Landowners and Managing Director Wayne Mitchell established Landowner consent for the 40km of pipelines to be constructed through their properties, with access points omitted pending resolution of Water Authority issues.

Santos Limited

GLNG – Fairview CSG Gathering Lines