Project

Poochera to Streaky Bay Pipeline

Design & Construct 55km of water line from 150 to 200 diam

Project Details

LOCATION

Streaky Bay, SA

PROJECT VALUE

6.4m

YEAR

2002

CLIENT

South Australian Water

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.

NSW Department of Commerce

Darling Anabranch Pipeline Project