Wandong Reticulation Sewerage Scheme

27 km of 200 mm dia PVC gravity pipeline and rising mains

Project Details

LOCATION

Wandong, VIC

PROJECT VALUE

5.2m

YEAR

2000

CLIENT

Goulburn Valley Water

Related Projects

Santos Limited

GLNG – Fairview CSG Gathering Lines

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.