Wimmera Mallee Pipeline Project _ Supply Systems 2T Trunk & Pump Stations

Design and construction of 960 km of pipelines ranging from 450mm to 150mm 6 Pump Stations, 10 water storage tanks and 2 earthen storages

Project Details

LOCATION

Wimmera Mallee, VIC

PROJECT VALUE

44m

YEAR

2007

CLIENT

Grampians Wimmera Mallee Water

Related Projects

Westside Corporation

Meridian Seamgas Trunklines

Mitchell was engaged on a Lump Sum EPC basis:

Engineer: including detail design of the pipeline alignments, profiles, road, waterway & service crossings, vents & drains, taking into account landholder constraints, endangered habitat and access issues, and SMS all to APGA CSG Gathering code.

Procure: including the purchase, transport, storage and correct dispatch of all materials and external services providers.

Construct: Install, test and commission the pipelines, and handover As Built GIS and complete MDR.

Evolution Resources PTY LTD

Cowal Gold Water Pipeline

Evolution’s Cowal Operation is located approximately 40km north-east of West Wyalong in New South Wales, Australia. This high-quality Australian gold asset with a long history of stable, large scale, low cost production. The mine pit encroaches the Lake Cowal ephemeral lake system. The lake is approximately 9.5km wide when full.