Project

Wimmera Mallee Pipeline Project _ Supply Systems 3 & 4

Design and construction of 3,200 km of pipelines ranging from 711mm to 50mm, 9 Pump Stations, 10 water storage tanks and 4 earthen storages

Project Details

LOCATION

Wimmera Mallee, VIC

PROJECT VALUE

200m

YEAR

2007

CLIENT

Grampians Wimmera Mallee Water

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.