Project

GLNG – Fairview CSG Gathering Lines

440km

Pipelines

$32m

Contract Value

Zero

LTI’s

DN800

Pipeline Diameter

Mitchell were awarded the contract for completion of 440km DN63 to DN800 Gathering Pipelines for Santos. In addition to the pipelines, Mitchell carried out civil works for completions of HSC04 and HSC05 hubs after the plant became live and under strict permit systems. The civils included procurement and construction of road pavements, drainage, bituminous sealing, concrete works and steel works.

Project Details

  • Major Tie ins
  • Live Digs & connections
  • Pneumatic strength and leak testing
  • Completion of PE pipelines
  • Replacement of GRE pipeline with SDR7.4 PE
  • Completion of Steel pipeline reinstatement
  • CP commissioning
  • Low Point Drains
  • High Point Vents
  • Golden Welds
  • Reinstatement
  • Test Packs
  • Material Data Register
  • Quality documents turnover

LOCATION

Injune, QLD

PROJECT VALUE

32m

YEAR

2014

CLIENT

Santos Limited

Related Projects

Grampians Wimmera Mallee Water

Wimmera Mallee Pipeline Project

Major construction challenges included major river crossings, a variety of cultural heritage sites and liaising with some 4,000 property owners.

Mitchell designed and constructed six of the seven supply systems in just over 3 years, delivering the project 6 years ahead of the original 10 year time frame.

Mitchell’s safety performance on the project was outstanding, completing 900,000 manhours without a single LTI.

NSW Department of Industry

Nimmie-Caira Wetlands