Project

Murtho SIS Scheme

Installation of 38km of PVC pipe ranging from 375mm to 250mm with 600m of 450mm PE pipe.

Project Details

LOCATION

Renmark, SA

PROJECT VALUE

4.5m

YEAR

2009

CLIENT

SA Water

Related Projects

Santos Limited

Roma West 2B Gathering Project

This particular section included gas and water gathering pipelines, along with the added complexity of installation of HV & FOC reticulation, often commingled within the trenches with the PE Gas & Water pipelines.

Pneumatic testing was progressively completed in five defined sections, allowing a sequenced handover of the asset to commence early gas extraction.

Completed on time and on budget, with zero defects, despite significant challenges of slow rock excavation and inclement weather.

Santos Ltd

K129 Gathering Pipelines