Merri Abba Bore Pipeline

Installation of 35km of DN300 PVC pipelines, 1 pump station, a 1ML concrete storage tank, treatment facilities and 30km of HV Powerlines.

Project Details

LOCATION

Lake Cargelligo, NSW

PROJECT VALUE

13m

YEAR

2011

CLIENT

Lachlan Shire Council

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.

Goulburn Murray Water

Tungamah Pipeline Project

A major challenge on the project from the outset was the resistance of several key Landowners to joining the scheme threatening to derail the project. Face to face meetings between the Landowners and Managing Director Wayne Mitchell established Landowner consent for the 40km of pipelines to be constructed through their properties, with access points omitted pending resolution of Water Authority issues.