Project

Campaspe Stock & Domestic Water Supply

28km of HDPE pipelines ranging in size from 50mm to 110 mm dia and 1 pump station.

Project Details

LOCATION

Rochester, VIC

PROJECT VALUE

1.5m

YEAR

2012

CLIENT

NVIRP

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.

NSW Department of Commerce

Darling Anabranch Pipeline Project