Project

GLNG _ CSG _ Roma Hub 02

2000 joints of HDPE piping ranging in size from 20mm to 400mm OD. 14km of HDPE piping ranging in size from 50mm to 400mm OD.

Project Details

LOCATION

Roma, QLD

PROJECT VALUE

8.5m

YEAR

2014

CLIENT

Santos/Fluor/Macdow

Related Projects

Santos Limited

Santos Pre-field Development

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.